Tiles And Baby Wing Composite Door Installation Video

Glazed, Tiles and Baby Wing Composite Door Installation Stages, Part 3

  • The door frames are removed from their packages and the gaskets are cleaned with a utility knife.
  • Gaskets are cut by putting them in place with the help of a roller.
  • Corner jointing apparatuses are attached to their places in the case with a plastic hammer and the cases are joined.
  • The frame is placed in the wall cavity with the help of a clamping wedge.
  • The square is checked with a spirit level. Rosettes are screwed to the reserved places on the lower and upper corners of the wing.
  • 3 hinges should be used for locally filled doors.
  • The hinges are screwed to the wing respectively, then to the frame from the bottom and top, in the specified dimensions. (The top hinge center is screwed to 250mm, the bottom hinge center is 300mm. The upper hinge is screwed to the frame from above with the hinge center 254mm.)
  • The sliders are mounted on the wing, on the lower and upper parts of the opening.
  • The lath is cut according to the length of both wings and attached to the wings.
  • The gaps between the frame and the sash are adjusted using the tensioner.
  • The places of the sliders on the ground and the frame are opened with the help of a drill.
  • The mounting foam is applied to the specified points (upper right/left, middle right/left, lower right/left) and allowed to dry. After drying, the foam that overflows from the frame is cut and cleaned with the help of a nail cutter.
  • In glazed applications, the sash is placed on the counter and the cut glass laths are attached to the wing with the help of nails.
  • The glass is mounted in such a way that it remains between the laths by applying a small amount of silicone.
  • The tile lath is cut according to the desired size. It is adhered to the glass surface on both sides of the wing with the help of double-sided tape and silicone.
  • The length of the sill and the upper part of the sill should be dimensioned and cut according to the application point.
  • The cut moldings are placed in their places on the frame with the help of a plastic hammer.
  • Lock and lever are mounted in their ready positions on the wing.
  • The striker is screwed into place on the frame.
  • Website Comments
Rate it
Fotoğraf
 
4110 Viewing
★★★★★ 0 (0 Rating)